Closing urban waste deposits in Jud. Alba - Abrud Lot 1-7, Blaj, Cimpeni, Cugir, Ocna Mures | 18.11.2014 - 18.11.2015 | .[...] | |||||||||
1996 - 1999 | Road infrastructure + suprastructure excepting the asphalt
New bridge 1 piece at Trei Poduri km 373 + 570 Rehabilitation of 10 existing bridges [...] |
||||||||||
Dam and HPP Bradisor | Anul PIF / Year of commissioning 1981 | Dam and HPP Brădişor
The turning into account of the Bradisor storage lake potentiality represents the last stage of the hydroelectric development of the Lotru river. The works are located on quartz-gneiss. Under the dam, on the right slope and i[...] |
|||||||||
Design and execution for two transfer stations in Alba County and purchase equipment related to the project Integrated Waste in Alba | 2014-2016 | Transfer station Blaj - capacity 15,000 tons / year
Ramps download 2 pcs (transfer station with direct download and compaction furniture - press-containers) Building transfer station S = 6.536 sqm - administrative building - eurocontainer, unloadin[...] |
|||||||||
Design and execution Highway Sebes-Turda - lot 4 km 53+700-km 64+500 | 14.09.2014 - 15 mai 2015 | Execution technological road 10.8 km, 721,862 sq topsoil stripping, land stabilization foundation, excavation excavations 1,485,005 cubic meters of excavation including stabilization Fillers hydraulic binder 1,129,896 cubic meters, paving the ground [...] | |||||||||